You don't have javascript enabled. Good luck with that.
Pencarian
Dua Rangkaian Kereta MRT Tiba di Jakarta

Two MRT Trains Arrive in Jakarta

Two Mass Rapid Transit (MRT) trains have arrived in Jakarta by shipment via Tanjung Priok Port, Wednesday (4/4) morning.

These two MRT trains arrived at 5 PM in Tanjung Priok Port today

PT. MRT Jakarta Director, William P. Sahbandar said, those MRT trains have arrived since 5 AM. "These two MRT trains arrived at 5 PM in Tanjung Priok Port today," he informed.

He explained, train will be unloaded from cargo ship in Thursday (4/5) and it will be transported to Lebak Bulus Depot using multi-axle trailer.

MRT Construction Reaches 92.50 Percent

His side also conducted shipment simulation and test from February 2018 to ensure shipping can be done well.

"We do it to minimize traffic jam that could be happened," he explained.

He added, 14 other sets of train will be shipped by the end of June and it is targeted to arrive in Jakarta by the end of October. All of trains will be prepared for trial run.

For the first phase, PT. MRT Jakarta has prepared 16 train sets. 14 trains will be operated while two others will be backed up.

"Later on, MRT will operate from 5 AM to midnight. At rush hour, train operated by a distance of 5 minutes between trains," he informed.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye829 personNurito
  2. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye603 personAldi Geri Lumban Tobing
  3. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye557 personDessy Suciati
  4. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye544 personAnita Karyati
  5. Sumenep Park Revitalization to Be Aligned with Gresik River Flow

    access_time18-09-2026 remove_red_eye453 personFolmer